TM 5-3810-307-10
NOTE: If the pile is
bowed, the bow should
face the Lead Tower
Hammer Line
(Main Hoist)
Pile Line
(Aux. Hoist)
Direct Drive
Assembly
Pile
Square
Rope Tag
(Concrete)
Line
Pile Adapter
Ground-Release
Shackle
Pile
Ground-Release
Shackle
Rope Tag
H-Type Pile
Line
Ground-Release
Lifting Sling
Shackle
Shackles
Rope Tag
Line
Pile
5' (1.5m)
5' (1.5m)
1" (2.5cm)
Steel
H-Beam Pile
Shackle
Holes Cut
96-inch
in Pile
Lifting Sling
WOOD PILE SHOWN (SQUARE
(CONCRETE) PILE SIMILAR)
STEEL H-BEAM PILE
Figure H-17. Set-up Pile (Wood Shown, Steel H-Beam, and Concrete Similar)
Change 1 H-63