a.
If removed, install shock mounts (9, Figure 2-1-22) on carrier mounting brackets with capscrews (8),
washers (7), and locknuts (6).
b.
Using suitable lifting device, lift cab assembly, position washers (5), as marked, on shock mounts (9),
lower cab onto mounts while positioning lines, cables, etc. for further routing, and align cab mounting holes with
mounts.
c.
Secure cab assembly to carrier with capscrews (3), washers (2 and 4), and locknuts (1).
d.
Remove lifting eyes from upper corners of cab, apply RTV to threads of bolts and install bolts in holes at
upper corners of cab.
e.
Connect cab ground cable to chassis near heater.
f.
Connect electrical lead to horn and remove tag.
g.
Connect four cab wiring harness ground wires to chassis and remove tags.
h.
Connect three large round electrical connectors and one square electrical connector to chassis wiring
harness and remove tags.
i.
Connect three trailer/parking brake air lines at unions under cab, and remove tags.
j.
Connect coolant system hoses to heater, heater control cable to shutoff valve, and remove tags.
Connect steering shaft, aligning match marks, to upper connection of 900 angle gearbox.
k.
l.
Route and connect air conditioner hoses to roof-mounted air conditioner, and install hose guards. Charge
air conditioner system, refer to instructions for assigned charging system, Lubrication Chart, and Appendix B.
m.
Route and connect throttle cable to accelerator pedal.
n.
Route and install main hydraulic pump disconnect cable on side console.