• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TORQUE CONVERTER/TRANSMISSION.
Charging Pump and Valve Assembly (Sheet 1 of 2)

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 1 - Pt2 Page Navigation
  28    29    30    31    32  33  34    35    36    37    38  
img
SM02-025-0
Page 19
Disconnect the shuttle valve to control valve
7.
Remove the shuttle valve assembly from align-
4.
crossover tube.
ing studs.
5.
Disconnect the shuttle valve solenoid wires.
8.
Remove the control valve assembly.
6.
Remove two valve to converter housing caps-
9.
Remove the drive plate capscrews and washers.
crews. Install two aligning studs to facilitate valve
removal. Remove the remaining capscrews.


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.