• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PROCEDURE 1. STRAIN RELIEF INSTALLATION
PROCEDURE 2B. EPROM LOCATION AND INSTALLATION

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 1 - Pt2 Page Navigation
  504    505    506    507    508  509  510    511    512    513    514  
img
TM 5-3810-307-24-1-2
11. PROCEDURE 2A. EPROM LOCATION AND INSTALLATION
Main Board 024-350-300-094
Ensure the notch is in the correct direction.
* Notch on EPROM must match the notch on the socket and markings on the board.
Place EPROMs in the correct EPROM socket as shown.
G-58 Change-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.