PROCEDURE 2A. EPROM LOCATION AND INSTALLATION
PROCEDURE 3A. MAIN BOARD 024-350-300-094 REPLACEMENT

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 1 - Pt2 Page Navigation
  505    506    507    508    509  510  511    512    513    514    515  
img
.
TM 5-3810-307-24-1-2
11. PROCEDURE 2B. EPROM LOCATION AND INSTALLATION
Main Board 024-350-300-222
Ensure the notch is in the correct direction. Notch on EPROM must match the
notch on the socket and markings on the board.
The DATA and TLK EPROMs fill the bottom of the socket as shown by the
arrows.
Place EPROMs in the correct EPROM socket as shown.