PROCEDURE 4B. PRESSURE TRANSDUCER ZERO ADJUSTMENT
PROCEDURE 5 LENGTH POTENTIOMTER AND ANGLE SENSOR ADJUSTMENT

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 1 - Pt2 Page Navigation
  511    512    513    514    515  516  517    518    519    520    521  
img
TM 5-3810-307-24-1-2
11. PROCEDURE 4B. PRESSURE TRANSDUCER ZERO ADJUSTMENT
continued
Main Board 024-350-300-222
4. Disconnect hydraulic hose from the rod side pressure transducer.
5. Connect a digital voltmeter to main P.C. board:
A) black (-) lead to MP15
B) red (+) lead to MP5
6. Adjust P5 to obtain a reading of 0.500 volts (500mV) on meter.
7. Reconnect hydraulic hoses to pressure transducers, then bleed the air from
hydraulic lines.
Change-1 G-65