• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Hammer Trip System Hammer Trip Assembly
Hammer Trip System Hammer Trip Assembly - Continued

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 1 - Pt2 Page Navigation
  710    711    712    713    714  715  716    717    718    719    720  
img
. . . .
TM 5-3810-307-24-1-2
1
HAMMER TRIP
TRACK RAILS
(REF.)
2
3
4
LEGEND
1.
Trip Transport Bolt
3.
Trip Gib Bolts, 3/4-10 NC 2 LG SHCS
2.
Hammer Trip Assembly
4.
Trip Gib
Figure K-31. Hammer Trip Assembly Installation
Inspection.
a.
Inspect all parts of the hammer trip assembly for wear, especially link pins (10, Figure
K-32), cam (4), and lifting pawl (7). Replace any bent link pins (10).
b.
Inspect each pin boss on the lifting pawl (7), cam (4), and connector links (11). Replace
if any have gone out of round.
Reassembly.
NOTE
Replace all roll pins (5, 8, and 12, Figure K-32) when reassembling the
hammer trip assembly. Also, use Loctite 272 on all bolts.
Change-1 K-73


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.