• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure K-39. Pile Gate Disassembly

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 1 - Pt2 Page Navigation
  727    728    729    730    731  732
img
. .
TM 5-3810-307-24-1-2
Reassembly.
a.
Slide the latch (10, Figure K-39) and torsion spring (9) onto the pile gate frame (3) and
secure torsion spring (9) into the position noted during removal.
b.
Slide the latch spacer (8) onto the pile gate frame (3) and install the retaining bolt (6).
Secure the retaining bolt (6) to the pile gate frame (3) with a new locknut (7).
c.
Install the eyebolt (5) onto the swing arm (4).
d.
Install the swing arm (4) onto the pile gate frame (3) and install the pivot bolt (2). Secure
the pivot bolt (2) to the pile gate frame (3) with a new pivot bolt locknut (1).
K-90 Change-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.