• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Piston and Rod Assemblies Installation
Piston and Rod Assemblies Installation - Continued

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 2 - Pt2 Page Navigation
  55    56    57    58    59  60  61    62    63    64    65  
img
TM 5-3810-307-24-2-2
Install the bearing shell in the connecting rod cap with the
tang of the bearing in the slot to the cap.
Use clean lubricating oil to coat the inside diameter of the
bearing shell.
The four digit number stamped on the connecting rod and
cap at the parting line must match and be installed on the
oil cooler side of the engine.
Install the connecting rod cap and capscrews to the
connecting rod.
12 mm, Torque Wrench
Tighten the two capscrews.
Torque Value: 35 Nm [26 ft-lb]
3823495 Dial Indicator
Use a fine grit stone to remove any burrs from the
cylinder block head deck.
Zero "0,' the dial indicator to the cylinder block head deck.
0-41 C-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.