TM 10-1670-298-20&P
2.33
PACKING, PREFORMED.
This task covers:
a.
Inspect b.
Replace
INITIAL SETUP
Tools
References
Paragraph 2.9
Materials/Parts
Packing, preformed (Appendix C)
Equipment Condition
Nose cone removed
INSPECT
Conduct a technical/rigger-type inspection In accordance with the instructions contained in paragraph 2.9.
REPLACE
Replace unserviceable preformed packing with serviceable items from stock.
2-76