c. Cleaning and Inspection.
e. Installation.
(1) Clean all parts.
(1) Connect slewing cylinder to linkage arm.
(2) Inspect for obvious damage.
(3) Replace defective parts as necessary.
(3) Inspect and adjust turntable rollers (TM
10-3950-203-20).
turntable and slewing linkage components.
Section III. ELECTRICAL SYSTEM
3-7. Generator
a. Removal. Remove generator (TM 10-3950-
20-20).
disassemble generator to extent necessary to effect
repair
3-12