TM 10-3950-672-10
b.
Position the hoist drum with the cable anchor slot on top, (Figure 6-3).
c.
Insert the cable through the slot and position around the anchor wedge.
NOTE
The end of the cable should be even with the bottom of the
anchor wedge.
d.
Position the anchor wedge in the drum slot; pull firmly on the free end of the
cable to secure the wedge.
NOTE
If the wedge does not seat securely in the slot, carefully
tap the top of the wedge with a mallet.
e.
Slowly rotate the drum, ensuring the first layer of cable is evenly wound onto
the drum.
f.
Install the remainder of the cable, as applicable.
Figure 6-3. Installing Cable Anchor Wedge
6-4. CABLE REEVING.
Within the limits of the load and range charts and permissible line pull, multi-part lines allow the operator to raise
a greater load then can be raised with a single part line. This reeving should be accomplished by a qualified rigger using
standard rigging procedures.
6-30