Figure 22. Crane engine piston and connecting rod assembly, removal and installation.
Section XVI. CRANE ENGINE FRONT MOUNT AND PULLEY ASSEMBLY
(4) Remove the front mount and pulley
110. General
The crane engine pulley assembly is connected
directly to the engine crankshaft and serves as an
b. Disassembly. Disassemble the front mount and
external means for starting the crane engine. The crane
pulley assembly in numerical sequence as illustrated on
engine front mount is bolted to the revolving crane
machinery deck.
112.
Crane Engine Front Mount and Pulley
111.
Crane Engine Front Mount and
Pulley
Assembly Cleaning, Inspection, and Repair
Assembly Removal and Installation
a. Removal.
a. Cleaning. Clean all parts with an approved
cleaning solvent and dry thoroughly.
(1) Remove the fan belts (TM 5-3810207-20).
b. Inspection and Repair. Inspect all parts for
excessive wear or damage. Replace or repair all
defective parts.
TAGO 5030A
60