1 Nut, 3/8-16
2 Washer, lock, 3/8 in.
3 Body
4 Stud, 3/8-16 x 1 3/8 in.
5 Sleeve
6 Pin, 5/32 in.
7 Helical gear
8 Pin, cotter, 1 1/4 x 1 3/8 in.
8 Body
9 Float screen
10 Screw, cap, 1/4-20 x 3/4 in. (6 rqr)
11 Washer, lock, 1/4 in. (6 rqr)
12 Cover
13 Gasket
14 Idler gear
15 Drive shaft
16 Snap ring
17 Driver gear
18 Key
19 Shaft
20 Bushing
Figure 21.-Continued.
108.
Crane Engine Flywheel and Flywheel Housing
Cleaning, Inspection, and Repair
a. Cleaning. Clean all parts with an approved
cleaning solvent and dry thoroughly.
b. Inspection and Repair. Inspect all parts for
excessive wear or damage. Replace or repair all
defective parts. With an approved indicator check the
flywheel run-out and counterbore. In both cases the
maximum indicator reading must not exceed 0.008 inch.
109.
Crane Engine Flywheel and Flywheel Housing
Reassembly and Installation
a. Reassembly. Reassemble the flywheel and
flywheel housing in the reverse of the numerical
b. Installation.
(1) Install the flywheel and flywheel housing
(4) Install the starter (TM 5-3810-20720).
Figure 21. Crane engine oil pump assembly, exploded
view.
TAGO 5030A
59