b. Cleaning and Inspection.
(2) Inspect all parts for breaks, cracks, and
other damage. Replace defective parts.
(1) Clean all parts with an approved cleaning
solvent and dry thoroughly.
Figure 116. Gear and chain guards, removal and installation.
Section XIX. LOAD ROLLER ASSEMBLY
198. General
199. Front Load Rollers
The crane is equipped with two sets of rollers. Two
a. Removal.
double rollers are mounted on the front of the revolving
(1) Place adequate cribbing between carrier
frame, and two single rollers are mounted in the rear.
frame and rear underside of main frame.
The rollers serve two functions, securing the crane
(2) Remove the front load rollers as
assembly to the turntable and supporting the entire
weight of the crane load.
AGO 6819A
139