frame and rear underside of main frame.
b. Disassembly. Disassemble the front load rollers
(2) Remove the rear load rollers as instructed
c. Cleaning and Inspection.
b. Disassembly. Disassemble the rear load rollers
(1) Clean all parts with an approved cleaning
solvent.
c. Cleaning and Inspection.
(2) Inspect all parts for excessive wear,
breaks, cracks, and other damage.
(1) Clean all parts with an approved cleaning
Replace all defective parts.
solvent.
d. Reassembly. Reassemble the front load rollers
(2) Inspect all parts for excessive wear,
breaks, cracks, and other damage.
Replace defective parts.
e. Installation. Install the front load rollers as
d. Reassembly. Reassemble the rear load rollers
f. Adjustment. When installing the roller plates,
install the required amount of shims to obtain 0.047 inch
e. Installation. Install the rear load rollers as
clearance between the rollers and roller circle.
f. Adjustment. Adjust rear load rollers in a manner
200. Rear Load Rollers
similar to the adjustment of the front load rollers (para.
a. Removal.
(1) Place adequate cribbing between carrier
Section XX. SAFETY RATCHET AND JAW CLUTCH ASSEMBLIES
201. Safety Ratchet Assembly
a. Removal and Installation. Remove and install
the safety ratchet and linkage as instructed in figure
b. Cleaning, Inspection, and Repair.
(1) Clean all parts with an approved cleaning
solvent.
(2) Inspect all parts for breaks, bends and
other damage.
Repair or replace
defective parts as necessary.
202. Jaw Clutch Lever Linkage
a. Removal and Installation. Remove and install
b. Cleaning, Inspection, and Repair.
(1) Clean all parts with an approved cleaning
solvent.
(2) Inspect the linkage for breaks, bends, and
other damage. Repair or replace linkage
as necessary.
Figure 119. Safety ratchet assembly,
removal and installation.
AGO 6819A
141