TM 5-3810-231-12
Section III. PREVENTIVE MAINTENANCE SERVICES
35. Daily Preventive Maintenance Services
34. General
This paragraph contains an illustrated tabulated
To insure that the Model 1125, 60 Ton Crawler
listing of preventive maintenance services which must
Crane is ready for operation at all times, it must be
be performed by the operator. The item numbers are
inspected systematically, so that defects may be
listed consecutively and indicate the sequence of the
discovered and corrected before they result in serious
minimum requirements. Refer to figure 17 for the Daily
damage or failure.
The necessary Preventive
Preventive Maintenance Services.
Maintenance Services to be performed are listed and
indicate the sequence of minimum inspection
36. Quarterly Preventive Maintenance Services
requirements. Defects discovered 'during operation of
the unit shall be noted for future correction, to be made
a. This paragraph contains as illustrated tabulated
as soon as operation has ceased. Stop operation
listing of preventive maintenance services which must
immediately if a deficiency is noticed during operation
be performed by Organizational Maintenance personnel
which would damage the equipment if operation were
at quarterly intervals. A quarterly interval is equal to 3
continued. All deficiencies and short comings will be
calendar months, or 250 hours of operation, whichever
recorded together with the corrective action taken on DA
occurs first.
Form 2404 at the earliest possible opportunity.
b. The item numbers are listed consecutively and
indicate the sequence of minimum requirements. Refer
to figure 18 for the Quarterly Preventive Maintenance
Services.
41