TM 5-3810-231-12
PREVENTIVE MAINTENANCE SERVICES
QUARTERLY
TM 5-3810-231-12
HARNISCHFEGER MODEL
CRANE
1125
LUBRICATE IN ACCORDANCE WITH CURRENT LUBRICATION ORDER
ITEM
PAR REF
1
LIGHTS. Inspect for burned out lamp, and insecure mounting. Inspect wiring for damage and loose
electrical connections.
2
HOOK ROLLERS. Inspect for wear and proper operation, adjust as necessary, correct clearance
between hook rollers and lower side of roller path is a maximum of 1/16 inch.
3
HOISTING CABLES. Inspect for worn, frayed or damaged cables, replace a defective cable.
4
BOOM ASSEMBLY. Inspect boom assembly for damage. Inspect sheaves for cracks. Replace a
damaged sheave or boom.
5
CONTROL PEDALS AND LEVERS. Tighten loose mounting hardware. Check for proper operation and
adjustment.
MEC 3810-231-12/18 (1)
Figure 18.
44