b. Cleaning and Inspection.
(1) Clean all parts and dry thoroughly.
(2) Inspect for cracks, or other damage.
Replace all defective parts.
c. Reassembly and Installation.
(1) Reassemble air cleaner as illustrated in
4-38. Throttle Control Assembly
a. Removal Remove the crane engine throttle
Figure 4-33. Crane engine throttle control assembly
Figure 4-33. Crane engine throttle control assembly rem
removal and installation. Sheet 1of 2.
oval and installation. Sheet 2 of 2.
4-41