b. Cleaning and Inspection.
(2) Install instrument panel as illustrated in
(1) Clean all parts.
(2) Inspect for defects or damage.
(3) Replace defective or damaged parts as re-
4-87. Oil Pressure Sending Unit, and Pressure
quired.
Switch
c. Reassembly and Installation.
a. Removal. Remove oil pressure sending unit and
(1) Reassemble
instrument
panel
as
Figure 4-82. Crane engine oil pressure sending unit and pressure switch, removal and installation.
4-86