gap at 0.010 inch.
4-102. Hoist Drum Shaft Clutch Bands (Left Hand
d. Tighten locknuts.
and Right Hand) Adjustment
4-103. Boom Hoist Brakeband Adjustment
Adjust boom hoist brake band as shown in figure 4-92.
a. Engage clutch by toggling in lever.
b. Use a feeler gage to set distance between dead
4-104. Hoist Brakeband Adjustment
and setscrew (fig. 4-91) on spider and band (not lining)
at 0.005 inch.
c. In the same manner set center adjusting screw
gap at 0.008 inch and the line end adjusting screw
Figure 4-91. Hoist clutch adjustment
4-95