d. Cleaning and Inspection.
e. Control Valves Reassembly. Reassemble the
(1) Clean all parts with an approved cleaning
f. Installation. Install the manifold, control valves,
solvent and dry thoroughly.
(2) Inspect for cracks, stripped threads,
g. Dozer Control Valve Stop Adjustment. Adjust
corrosion or other defects.
(3) Replace all gaskets, and damaged or
defective parts.
stop dozer control lever just before spool reaches the
end of strokes (lower and raise).
Figure 4-117. Control valve stop adjustment.