d Refer to TM 5-764 for armature and field coil
4-10. Cleaning, Inspection and Repair
tests.
a Clean all metal parts with an approved cleaning
solvent and dry thoroughly.
b Remove all dust, dirt, and foreign matter from
4-11. Reassembly and Installation
the frame and fields using compressed air.
a Reassembly.
and
c Inspect all parts for excessive wear or other
reassemble the starting motor assembly.
damage. Repair or replace all defective parts.
b Installation. Refer to TM 5-3810-232-12.
Section IV. CRANE BATTERY CASE ASSEMBLY
b Inspect all parts for defects or damage. Repair
4-12. Removal
all defective parts.
Remove the battery case. (TM 5-3810-232-12).
4-14. Installation
4-13. Cleaning, Inspection and Repair
Install the battery case. (TM 5-3810-232-12).
a Clean all parts with an approved cleaning solvent
and dry thoroughly.
Section V. CRANE WIRING HARNESS
d. Remove wiring harness.
4-15. General
The wiring harness covered in this section include all
4-17. Repair
wiring harness assemblies used in the crane assembly.
Wire size and length of wire are given in TM 5-3810-232-
Repair defective wires in wiring harness.
35P.
4-18. Installation
4-16. Removal
a Note tags and connect all electrical leads
a Tag and disconnect all electrical leads.
and connectors.
b Tag and disconnect all electrical connectors.
b Connect all clamps and straps.
c Disconnect all clamps and straps, noting
location.
Section VI. CRANE ENGINE FUELPUMP AND GOVERNOR ASSEMBLY
4-19. General
4-20. Removal and Disassembly
The fuel pump assembly incorporates the governor
a Removal. Remove the fuel pump as illustrated
assembly and is flange mounted to the engine gear case
and is driven from the engine gear train. The fuel pump
draws fuel from the supply tank and delivers it at correct
pump assembly.
pressure and amount to the injectors for each cylinder.
4-5