Home
Download PDF
Order CD-ROM
Order in Print
Figure 3-46. Carrier engine main bearing side bolt tightening sequence.
Chapter 4. CRANE ENGINE REPAIR INSTRUCTIONS
TM-5-3810-232-34 Crane Wheel Mounted: 20 Ton at 10 Foot Radius 2 Engines Diesel Engine Driven 4x4 Air Transportable Phase III Manual
Page Navigation
92
93
94
95
96
97
98
99
100
101
102
j
Bend
tangs
on
all
lockplates
to
secure
bolts.
m
Install
connecting
rod
and
piston
assemblies
k
Install
gear
housing
and
camshaft
(para
3-57).
(para
3-71).
l
Install
flywheel
and
housing
(para
3-54).
n
Install
engine
assembly
(para
2-10).
3-69