TM 5-3810-289-12
Figure 2-11. Dragline cable reeving.
(b) Drag cable.
1. Refer to table 4-3 for correct cable
(b) Remove pin securing reach rod (5)
length.
to lever (4); remove reach rod (5), place on lever (3) and
2. Lead cable over left guide sheave,
install pin.
around padlock sheave, and over right guide sheave.
(c) Remove capscrews (10) securing
3. Attach end to drag drum.
lever extension (8) to short lever (9). Insert cap screws
4. Attach other end to anchor on left side of
(10) through short lever extension (6) and secure short
boom.
lever extension (6) to lever extension (8).
b. Removal. Removal procedure is reverse of
(d) Middle lever (1) now controls front
installation.
drum reach rod (7) and hoist lever (2) controls rear drum
reach rod (5).
2-8.
Shovel Front End Conversion
(3) Installation of crowd chain sprocket on
a. Installation.
and change operating levers linkage, if not in correct
configuration, as follows:
2-11