SUB-SECTION 5E
shaft. When the motor is properly positioned, install screws
9. Install outside motor band (5) and front cover (4). In-
(3) with washers (4).
stall tie bolts (2) through front and back covers. Apply a
small amount of Loctite Grade E sealant to the lie bolt
11. Pretension the hose reel by turning the reel clockwise,
threads, and then install nuts (3).
as viewed from the hose side, three turns. Cast off one wrap
of hose from the reel. without removing any pretension,
and attach the hoses to the upper telescope cylinder.
making sure the reel shaft drive pin engages the motor
Figure 5E-1. Hose Reel (36Z691)
5E-2