e. Main Hoist Line Reeving.
(1) Main hoist line reeving is shown in figure
2-12. The
number of
parts of
line (from one to
five) used
on the main hoist line depends on the weight of the loads
to be lifted .and the line speed desired. For maximum
speed of operation, use no more parts of line than are
required for the loads to be lifted, within the limitations
shown on the rating plate in the machine crane cab,
Figure 2-11. Securing cable to drum.
Figure 2-12. Main hoist line reeving.
2-6