TM 5-3810-295-34
down movement.
CAUTION
m. Coat ball end of push rods with clean engine oil.
When installing clamps, make sure the hold
Install push rods (1) and (2). Engage push rods adjust-
down yokes do not contact crosshead stems.
ing screws in push rod sockets.
l. Torque screws (17) to 30 to 35 ft-lb (41-47
N. m). Check injector plunger for freedom of up and
Section V.
CYLINDER HEAD
(7) and tube connector (8) from the cylinder head.
14-16. Removal and Disassembly
Discard packing.
a. Refer to figure 14-12. Remove cylinder head as
(3) Remove headbolts (9) and (10) and
follows:
washers (11).
(1) Remove intake and exhaust crossheads (1)
(4) Lift cylinder heads (12) from engine block.
and (2). Remove crosshead nuts (3) and adjusting
Remove gaskets (13).
screws (4)
(2) Remove dowels (5) packing (6), tube nuts
1
Intake crosshead
12 Cylinder head
22 Insert
2
13 Gasket
23 Guide
3
Crosshead nut
14 Lock
24 Ring
4
Adjusting screw
15 Guide
25 Preformed packing
5
Dowel
16 Outer spring
26 Sleeve
6
Preformed packing
17 Inner spring
27 Guide
7
Nut
18 Seal
28 Plug
8
Tube connector
19 Wear plate
29 Plug
9
Headbolt
20 Valve
30 Plug
10
Headbolt
21 Insert
31 Plug
11
Washer
Figure 14-12. Cylinder head-exploded view
14-12