TM 5-3810-295-34
19-15. Cleaning, Inspection and Repair
the connections with electrical tape.
a. Check all wiring for frayed insulation broken
19-16. Installation
wires, corroded terminals loose terminals and
Refer to figure 19-4 to locate harness termination points
ground connections, and broken or missing cable
and reinstall as follows:
clamps.
a. Place harness carefully in its routed position in the
b Repair damaged or broken wire by cutting a
carrier.
length of wire of the same size and color code and
b. Note tags and connect all electrical leads and
tapping it along the harness. Install two clips, one
connectors.
at each end, and remove the faulty wire. Secure
c. Connect all clamps and straps.
the end of the new wire to the remaining end of the
old wir. Insulate
Section V. REPAIR OF OUTRIGGERS AND PADS
19-1 7. Description
outrigger assembly.
The carrier is equipped with four outriggers and
(2) Remove four mounting bolts and with a suitable
float pads.
The outriggers are hydraulically
lifting device remove outrigger assembly from the frame.
controlled and can be raised and lowered by
c Refer to figure 19-6 and disassemble the float pads as
individual levers mounted in the carrier cab.
follows:
19-18. Removal and Disassembly
(1) Remove cap screws (1) and lock washers (2). Lift
a. Refer to TM 5-3810-295-12 and remove the
float plate (7) of outrigger float pad (8).
outrigger float pads.
(2) Remove roll pin (3) and separate toggle pin (4)
b Refer to figure 19-5 and remove the outrigger
from pin (5). Remove chain (6) from pin (5).
assemblies as follows:
(1) Tag and disconnect all hydraulic lines to the
Figure 19-5. Outrigger assembly removal
19-10