TM5-3810-305-10Section ISectionalizationThe LRT 110 Type II Crane is equipped with anents are stored on the LRT 110 Crane withsectionalization kit complete with all componentspinned connections in storage locations A thru Eand tools necessary to disassemble it into two(Figure 5-l). All tools, extension hoses andseparate loads for transport, and reassemble it onaccessories required are stowed in carrier toolanother site. All of the sectionalization compo-box on left side of vehicle.TOOL BOXPreparation for and Sectionalization ofthe LRT 110 Type II Crane for External AirTransport (EAT).Preparation for Separating Upperstruc-ture from CarrierThe LRT 110 Crane should be positioned on asuitable unobstructed location for disassemblyprocedure.Vehicle must be level to preventpossible loss of control of upper-structure when lifting off ofcarrier. DEATH or seriousinjury may result if upperstruc-ture gets out of control.1. Start engine and with boom lowered over cab,retracted and in travel position, proceed asfollows:5-2Figure 5-1. Storage Locations
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business