TM5-3810-305-10
Section I
Sectionalization
The LRT 110 Type II Crane is equipped with a
nents are stored on the LRT 110 Crane with
sectionalization kit complete with all components
pinned connections in storage locations A thru E
and tools necessary to disassemble it into two
(Figure 5-l). All tools, extension hoses and
separate loads for transport, and reassemble it on
accessories required are stowed in carrier tool
another site. All of the sectionalization compo-
box on left side of vehicle.
TOOL BOX
Preparation for and Sectionalization of
the LRT 110 Type II Crane for External Air
Transport (EAT).
Preparation for Separating Upperstruc-
ture from Carrier
The LRT 110 Crane should be positioned on a
suitable unobstructed location for disassembly
procedure.
Vehicle must be level to prevent
possible loss of control of upper-
structure when lifting off of
carrier. DEATH or serious
injury may result if upperstruc-
ture gets out of control.
1. Start engine and with boom lowered over cab,
retracted and in travel position, proceed as
follows:
5-2
Figure 5-1. Storage Locations