T M 5 - 3 8 1 0 - 3 0 5 - 103.4.5.Observe length of cable endprotruding from cable socket andclamp. If cable end extendsmore than 2 in. (51 mm), adjustcable so no more than 2 in. (51mm) protrude. Excessive cableprotrusion can push cable out ofsocket when hook block ishoisted with plate to boom head.Failure to follow this procedurecould cause DEATH or seriousinjury.NOTEWhen counterweight has beenremoved from anti-block switch,the switch is shut off and LRT110 Crane control disconnectsystem has been deactivated.Functions of raising winch, andextending and lowering boomwill not operate. To use any ofthese functions for the followingprocedures, turn on anti-twoblock BY-PASS switch. This isto be done only as required.Prepare to raise hook block up to boom headby removing plate ( 1, Figure 5-3) from toolbox and place over dead end bracket on top ofhook block. The LRT 110 Crane should bereeved with a two-part line for this procedure.Start engine and swing upperstructure andboom around to right side of carrier to 2o’clock position.Shut engine off.Figure 5-3.Preparation for Raising the Hook Block5 -4
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business