TM5-3810-305-10c.d.Remove two truss rods (10) from mast (3,e.Figure 5-42) and stow two truss rods (10)and adjustable truss rod (11, Figure 5-11)in location A on upperstructure.Weight of mast is approximately98 lb (44 kg). Use two people toproperly support and lift themast. Failure to follow thisprocedure could cause DEATHor serious injury.Remove mast (3, Figure 5-42) and lay ondeck.Disassemble and stow boom support thatwas removed in step 8 of Preparing theUpperstructure for Lift. Remove two pins(2) and tube (24, Figure 5-29) and store intool box. Remove three remaining pins(23) that connect posts (19), (20) and (22)to post (21). Using pins (23), stow post(19) at storage location D (Figure 5-26) onupper structure, post (20) at storage loca-tion A (Figure 5- 11) on upperstructure andposts (21) and (22) at storage location E(Figure 5-27) on frame.Figure 5-11 Storage Locations A and BFigure 5-26 StorageLocation DFigure 5-29 Support for Front of BoomFigure 5-27 Storage Location E5-43
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business