TM5-3810-305-10
Removal and Stowage of Remaining
Parts Used in Assembly
1. Lower boom to horizontal position using the
following procedure:
a. Remove wedge from winch and stow in
tool box.
b. Start engine. Lower boom to a horizontal
position while raising hook block.
c. Remove plate (1) from top of hook block
(Figure 5-3) and stow in tool box.
d. Shut engine off.
2. Remove and stow lift equipment as follows:
a.
b.
Weight of lift arm is approxi-
mately 95 lb (43 kg). Use two
people to properly support and
lift the lift arm. Failure to follow
this procedure could cause
DEATH or serious injury.
Remove pin (12) from adjustable truss rod
(11) at top of mast (3) and lower lift arm
(16) to deck. Remove pin (12) from
adjustable truss rod (11 ) and set adjustable
truss rod (11 ) aside temporarily. Remove
pin (17) from lift arm (16) at base of mast
(3, Figure 5-42).
Remove lift arm (16) and stow in location
B using one pin from tool box. Install
sheave (14) back in clevis on lift arm (16)
with pin (13). Index sheave pin (13) and
lock sheave bracket to side of lift arm (16,
Figure 5-11 ).
Figure 5-3. Preparation for Raising the Hook Block
Figure 5-42 Disassembling the Mast
5-42