Figure 3. Thermostat Installation.
WATER INLET CONNECTION MAINTENANCE

Technical Manual For Crane, Wheel Mounted, Hydraulic, Light, 7 1/2 Ton Page Navigation
  360    361    362    363    364  365  366    367    368    369    370  
img
. . . . .
TM 5-3810-305-23
0056
INSTALLATION - Continued
2.
Install lifting bracket (Figure 4, Item 1), new gasket (Figure 4, Item 4), thermostat housing (Figure 4, Item 2),
and three capscrews (Figure 4, Item 3). Tighten three capscrews to 18 ft-lb (24 Nm).
1
2
3
4
5
M0296105
Figure 4. Thermostat Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install upper radiator hose (WP 0054).
2.
Install alternator (WP 0062).
3.
Install drive belt (WP 0059).
4.
Connect battery cables (WP 0076).
5.
Fill radiator with coolant (TM 5-3810-305-10).
6.
Run engine until normal operating temperature is reached (TM 5-3810-305-10).
7.
Inspect for leaks.
8.
Place boom in resting position (TM 5-3810-305-10).
9.
Shut down engine (TM 5-3810-305-10).
END OF TASK
END OF WORK PACKAGE
0056-4
03/15/2011Rel(1.8)root(maintwp)wpno(M00062)