TM 5-3810-305-23
0056
INSTALLATION - Continued
2.
Install lifting bracket (Figure 4, Item 1), new gasket (Figure 4, Item 4), thermostat housing (Figure 4, Item 2),
and three capscrews (Figure 4, Item 3). Tighten three capscrews to 18 ft-lb (24 Nm).
1
2
3
4
5
M0296105
Figure 4. Thermostat Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
2.
3.
4.
5.
Fill radiator with coolant (TM 5-3810-305-10).
6.
Run engine until normal operating temperature is reached (TM 5-3810-305-10).
7.
Inspect for leaks.
8.
Place boom in resting position (TM 5-3810-305-10).
9.
Shut down engine (TM 5-3810-305-10).
END OF TASK
END OF WORK PACKAGE
03/15/2011Rel(1.8)root(maintwp)wpno(M00062)