TM 5-3810-305-23
0057
INSTALLATION
Install new o-ring (Figure 2, Item 3), water inlet connection (Figure 2, Item 2), and three capscrews
(Figure 2, Item 1).
1
2
3
M0299105
Figure 2.
Water Inlet Connection Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
2.
3.
4.
5.
Fill radiator with coolant (TM 5-3810-305-10).
6.
Run engine until normal operating temperature is reached (TM 5-3810-305-10).
7.
Check for leaks.
8.
Place boom in resting position (TM 5-3810-305-10).
9.
Shut down engine (TM 5-3810-305-10).
END OF TASK
END OF WORK PACKAGE
03/15/2011Rel(1.8)root(maintwp)wpno(M00063)