TM 5-3810-305-23
0082
REMOVAL - Continued
NOTE
Boom must be raised to highest position to aid in removing wire harness clamps.
12.
13.
Start engine. Raise boom to highest position (TM 5-3810-305-10).
14.
Remove two nuts (Figure 6, Item 1), washers (Figure 6, Item 2), and clamps (Figure 6, Item 3) from vehicle.
15.
Install two washers (Figure 6, Item 2) and nuts (Figure 6, Item 1).
16.
Remove nut (Figure 6, Item 7), washer (Figure 6, Item 8), and clamp (Figure 6, Item 9) from vehicle.
17.
Remove nut (Figure 6, Item 4), washer (Figure 6, Item 5), and clamp (Figure 6, Item 6) from vehicle.
1,2,3
4,5,6
7,8,9
1,2,3
M0170105
Figure 6.
Boom Wiring Harness Removal.
03/15/2011Rel(1.8)root(maintwp)wpno(M00088)