• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Boom Wiring Harness Removal.
Figure 7. Boom Wiring Harness Removal.

Technical Manual For Crane, Wheel Mounted, Hydraulic, Light, 7 1/2 Ton Page Navigation
  505    506    507    508    509  510  511    512    513    514    515  
img
. .
TM 5-3810-305-23
0082
REMOVAL - Continued
NOTE
Boom must be raised to highest position to aid in removing wire harness clamps.
12.
Connect battery cables (WP 0076).
13.
Start engine. Raise boom to highest position (TM 5-3810-305-10).
14.
Remove two nuts (Figure 6, Item 1), washers (Figure 6, Item 2), and clamps (Figure 6, Item 3) from vehicle.
15.
Install two washers (Figure 6, Item 2) and nuts (Figure 6, Item 1).
16.
Remove nut (Figure 6, Item 7), washer (Figure 6, Item 8), and clamp (Figure 6, Item 9) from vehicle.
17.
Remove nut (Figure 6, Item 4), washer (Figure 6, Item 5), and clamp (Figure 6, Item 6) from vehicle.
1,2,3
4,5,6
7,8,9
1,2,3
M0170105
Figure 6.
Boom Wiring Harness Removal.
0082-7
03/15/2011Rel(1.8)root(maintwp)wpno(M00088)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.