TM 5-3810-306-10PICK AND CARRY OPERATIONSWARNINGExercise extreme caution when pickingand carrying a load.1.When performing pick and carry operations oroperating on sloping ground, carry loads much lessthan capacity. Keep load low and uphill from crane.Swing load only to keep the load uphill, and alwaysplace loads on high side.2.When traveling with a load, boom should be carriedin line with direction of motion.EMERGENCY BOOM OPERATING PROCEDURESAlthough improbable the boom lift cylinders hydraulicequalizer line could fail. If this occurs, there are devicesthat allow continued crane operation. All crane functionsremain operable until the hydraulic oil in the reservoir isdepleted. The most important thing is to get the boom ina safe position so that repairs can be made. Thefollowing procedures are recommended for getting theboom to a safe position should the equalizer line fail.1.Don’t panic. Remain in cab. All functions can beaccomplished from cab.2.Maintain engine at normal operating speed.3.Maintain desired boom angle by pulling back onboom control lever, as necessary. With oil leakingfrom the hydraulic system, boom angle will drop ifyou do not react.4.While maintaining boom at this angle: activate swing;retract boom; and operate hoist(s) as necessary untilload is safely lowered to ground.5.If over-the-side, retract as much boom as possibleand then lower boom. If over-the-front, it will not benecessary to retract boom. Remember, boomcannot be lowered to minimum elevation over-the-rear, as boom would hit engine hood.EMERGENCY LOAD LOWERING PROCEDUREIn the event of a hydraulic system failure (pumps, dieselengines, etc.), it will be necessary to lower a suspendedload, retract the boom, swing the boom over the frontand retract the outriggers in order to tow the crane to amaintenance area.To return the crane to the travel mode from; elevatedand extended boom; over-the-side; with suspended loadand outriggers extended and set; proceed as follows:NOTEA hand pump is permanently installedbehind the sheet metal, on the righthand side of the crane, forward of thehydraulic reservoir. Refer to the figuretitled - Hand Pump Operation, providedfor this procedure.1.Install pump handle and hoses.a.Remove pump handle and three (3) hoses (oneeach at 12-feet, 18-feet and 38-feet long) fromtool box.b.Install pump handle.2-54
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business