TM 5-3810-306-10
WARNING
Check the load chart for maximum load
at given radius, boom angle, and length
before extending boom with a load.
1.
To extend boom, push TELE control lever forward
away from you and hold until boom extends to
desired length.
WARNING
When extending the boom, the load will
raise unless the cable is let out.
2.
To retract boom, pull TELE control lever back,
toward you and hold until boom retracts to desired
length.
LOWERING AND RAISING HOIST CABLE
WARNING
Before lowering or raising the cable
(load), ensure the area beneath the load
is clear of all objects and personnel.
CAUTION
When starting or stopping the cable, do
not jerk the control lever, jerking the
lever causes the load to bounce, which
could result in damage to the crane.
NOTE
When the load is stopped at the desired
height, the hoist brakes will engage and
hold the load as long as the control lever
remains centered.
1.
To lower hoist cable, push MAIN hoist or AUX hoist
control lever forward, away from you, and hold until
hook or load is lowered to desired height.
2-50