TM 5-3810-306-20
b. Remove elbows (10). Discard preformed
packings (11).
c. Remove capscrew (14) and plate (13).
INSTALLATION:
1.
INSTALL TURBOCHARGER AFTERCOOLER.
a. Install poppet drain cock (15) in aftercooler
housing (3).
b. Align aftercooler (3) and new gasket (7) with
cylinder block mounting holes and secure with
eighteen capscrews (8). Torque to 18 ft-lbs (24
Nm).
2.
INSTALL
TURBOCHARGER
AFTERCOOLER
PIPING.
a. If removed, install plate (13) with capscrew (14).
b. Install elbows (10) with new preformed packings
(11) at rear of cylinder block.
c. Install hoses (9), lines (5) and (6), and clamps
(4) at aftercooler (3) and elbows (10).
d. Remove cover from aftercooler (3) opening and
install hoses (1) and (12), and clamps (2) to
aftercooler (3) and turbocharger.
CAUTION
Open petcocks to vent engine and
aftercooler to prevent entrapment of
air as the system is filled.
e. Service radiator. (Refer to TM 5-3810-306-10.)
f.
Close petcocks.
3.
START ENGINE AND CHECK FOR NORMAL
OPERATION. (REFER TO TM 5-3810-30610.)
CHECK FOR COOLANT LEAKS.
4.
CONNECT GROUND CABLE AT SHUNT. (REFER
TO PAGE 8-109.) END OF TASK
7-20