TM 5-3810-307-24-1-1
i.
Connect air cooler tubes to flexible hoses (12) and tighten clamps (11). Torque "Breeze" clamps 50-60 lbs-
in. (5.6-6.7 Nm) or "R. G. Ray" clamps 60-75 lbs-in. (6.7-8.5 Nm).
j.
Install engine hood center cowl, refer to Engine Hood Installation procedures.
k.
Install exhaust tube and adapter between turbocharger and flexible tubing, refer to Muffler and Piping
Installation procedures.
l.
Secure recovery tank overflow hose (10) to shroud (44) with clamps (9) and capscrews (8).
m.
Connect recovery tank coolant hose (7) to radiator (34) filler neck and tighten clamp (6).
n.
Connect support rod (29) to bottom of radiator (34) with lockwasher (28) and nut (27).
o.
Secure drain hose (5) to carrier frame with clamp (4), washer (3), lockwasher (2), and nut (1).
p.
Install engine top panel and side access doors, refer to Engine Hood Installation Procedures.
q.
Ensure drain valve (49) is closed and service radiator.
r.
Using static coolant system pressure tester, perform static check of coolant system.
s.
Start engine and check for leaks. Shut down engine after 15 minutes of operation. Allow system to cool.
t.
Check coolant level in recovery tank and service if necessary.
2-2-37