• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
3rd AND 4th CLUTCH.
3rd AND 4th CLUTCH. - Continued

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 1 - Pt2 Page Navigation
  85    86    87    88    89  90  91    92    93    94    95  
img
SM02-025-0
Page 76
5.
Install one steel disc.
8.
Install the end plate retainer ring.
REVERSE.
6.
Install one friction disc. Alternate steel and fric-
tion discs until the proper amount of discs are in-
stalled. First disc next to the piston is steel, last disc
NOTE
installed is friction.
Ring must be sized before installing in
clutch drum. Sizing is best accomplished
by rotating piston while holding a round
object against the new seal ring as
shown. Rotate piston until seal ring is
flush with outer diameter of piston.
1.
Install clutch piston outer and inner seal rings.
7.
Install the clutch disc end plate.


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.