• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
3rd AND 4th CLUTCH. - Continued
FORWARD HIGH AND 5th AND 6th CLUTCH.

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 1 - Pt2 Page Navigation
  88    89    90    91    92  93  94    95    96    97    98  
img
SM02-025-0
Page 79
internal teeth of the friction discs. Do not force this
operation. The gear splines must be in full position
with the internal teeth of all friction discs.
16. Install the bearing retainer ring.
13.  Install the outer t aper bearing, large diameter of
taper up.
17.  Install the clutch shaft oil sealing rings. Grease
the rings to facilitate reassembly into the front
housing.
14.
Install the bearing retainer ring.
15.  Install the clutch shaft front bearing with the
bearing locating ring groove up.


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.