• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Heating Elements
APPENDIX K. BERMINGHAMMER PILE DRIVER SYSTEM INSTRUCTIONS FOR MAINTENANCE, TROUBLESHOOTING, AND REPAIR

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 1 - Pt2 Page Navigation
  638    639    640    641    642  643  644    645    646    647    648  
img
. . . .
TM 5-3810-307-24-1-2
Seven Day Timer. (Refer to Figure J-19.)
Removal.
a.
Ensure battery disconnect switch is in the OFF position.
b.
Remove connector (75, Figure J-19) from the back of the seven day timer (74).
c.
Slide the seven day timer (74) out from the mounting bracket (77).
Installation.
a.
Ensure the 24V bulb (green bulb casing) is installed in the seven day timer (74, Figure
J-19) and slide the seven day timer (74) into the mounting bracket (77).
b.
Connect the connector (75) into the back of the seven day timer (74).
Change-1 J-57/(J-58 Blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.