• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Impact Block Compression Rings
Figure K-21. Catch Ring Cap Installation

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 1 - Pt2 Page Navigation
  688    689    690    691    692  693  694    695    696    697    698  
img
. . . .
TM 5-3810-307-24-1-2
Installation.
a.
Install the impact block compression rings (3, Figure K-20) in the proper grooves on the
impact block (1). Position the impact block compression rings (3) such that no two gaps
are directly in line. Each gap should be staggered 90 degrees from the adjacent gap.
b.
Install the impact block in the lower cylinder (Page K-49).
c.
Install the direct drive assembly onto the lower cylinder (Page K-44).
3
1
2
5"
SLING
LOCATION
LEGEND
1.
Impact Block
3.
Impact Block Compression Rings
2.
Lower Cylinder
Figure K-20. Impact Block and Impact Block Compression Rings Installation
Change-1 K-51


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.