• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Injector Nozzles - Installation
Fuel Drain Manifold - Installation (0-110)

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 2 - Pt2 Page Navigation
  93    94    95    96    97  98  99    100    101    102    103  
img
. .
TM 5-3810-307-24-2-2
Valve Covers - Installation (0-105)
16 mm
Assemble the gaskets, valve covers, o-rings and
special capscrews.
Torque Value: 24 Nm [18 ft-lb]
Manifold Cover - Installation (0-106)
3375066 Sealant
Apply sealant to the capscrews as shown in the
illustration.
Install the manifold cover, gasket, fuel filter assembly,
and capscrews.
Do not tighten capscrews until the high pressure fuel
line brackets are assembled.
Aftercooler - Installation (0-107)
3375066, 3823494 Sealant
Apply sealant, Cummins P/N 3375066, Loctite P/N
59231, or NSN 8030-01-054-0740 to the capscrews as
shown in the illustration.
Apply a 4 mm (0.16 in.) bead of Three Bond 1207-C
sealant (Cummins P/N 3823494) around the sealing
surface of the aftercooler as shown in the illustration.
NOTE
See Sealants information in TM 5-3810-307-
24-2, Volume 1, page V-17.
Fuel Lines - Installation (0-108)
17 mm
Install the fuel filter supply line.
The banjo fittings at the filter head require sealing
washers on each side of the line. The banjo fitting with
the vent screw is used to install the pump supply line.
0-79 C-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.