• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Fuel Drain Manifold - Installation (0-110)
Turbocharger - Installation (0-116)

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 2 - Pt2 Page Navigation
  95    96    97    98    99  100  101    102    103    104    105  
img
.
TM 5-3810-307-24-2-2
13 mm
Tighten all of the manifold cover capscrews.
Torque Value: 24 Nm
[18 ft-lb]
14 mm, 17 mm
Make sure that the high pressure lines will not rub
against other engine components.
Tighten the high pressure lines at the injection pump
and injectors securely.
Torque Value: 24 Nm
[18 ft-lb]
12 mm and 13 mm
Install the air/fuel control tube and turbocharger
wastegate line.
Exhaust Manifold - Installation (0-113)
"Package" the exhaust manifold capscrews and gaskets
on the manifold. Apply anti-seize compound to the
capscrews.
NOTE
The bead on the exhaust manifold gasket
can be installed in either direction.
13 mm
Install the exhaust manifold and gaskets.
Torque Value: 43 Nm
[32 ft-lb]
Follow the sequence shown.
0-81 C-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.