Throttle  Lever Replacement, Bosch P7100 (5-36)
NOTES

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 2 - Pt2 Page Navigation
  198    199    200    201    202  203  204    205    206    207    208  
img
TM 5-3810-307-24-2-2
Wiring Guidelines
Refer to the chart below to find the correct gauge size
and length of continuous wire for the white (pull-in)
wire, which connects to the solenoid wiring.
Length of Wire
0-4.5 ft
0-7.0 ft
0-11 ft
Gauge
14
12
10
NOTE
14 gauge wire is required for the red (hold-in)
wire, which connects to the "Run" terminal on
the ignition switch.
NOTE
The black (ground) wire must be the same
size as the white (pull-in) wire.
Solenoid Resistance check
The synchro-start solenoid can be checked using a
volt-ohmmeter. Check the solenoid resistance.
Resistance
Solenoid
Min Ohms
Voltage
Pull-In
Hold-In
12
0.22
11.1
24
0.82
41.3
Solenoid Voltage Check
If the Synchro-Start solenoid checks good, the problem
is with the wiring circuit to the solenoid.
To perform the solenoid voltage check, connect the
wiring harness and apply voltage to the solenoid with
the ignition key as follows:
1. With the key in the run position, check the voltage
hold-in.
2. With the shut down lever held in the shut down
position, move the key to the start position and
check the pull-in voltage.
Battery
Min Voltage
Voltage
Pull-In
Hold-In
12
6.5
4.0
24
13.0
8.0
5-9 C-1