Engine Dynamometer Test - Engine Run-In (14-02) - Continued
Engine Dynamometer Test - Performance Checking (14-03)

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 2 - Pt2 Page Navigation
  283    284    285    286    287  288  289    290    291    292    293  
img
TM 5-3810-307-24-2-2
Operate the engine at this speed and load level for 2
minutes.
Check all gauges and record the data.
NOTE
Do not proceed to the next step until blowby
is stable and within specifications.
Maintain the engine speed at torque peak RPM,
increase the dynamometer load to 75 percent of torque
peak load. Operate the engine at this speed and load
level for 2 minutes. Check all gauges and record the
data.
NOTE
Do not proceed to the next step until blowby
is stable and within specifications.
Move the throttle lever to its fully opened position, and
increase the dynamometer load until the engine speed
is at torque peak RPM. Operate the engine at this
speed and load level for 10 minutes or until the blowby
becomes stable and within specifications.
Check all gauges and record the data.
Reduce the dynamometer load until the engine speed
increases to the engine's rated RPM.
Operate the engine at rated RPM for 5 minutes.
Check all gauges and record the data.
14-17