• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Engine Dynamometer Test - Performance Checking (14-03) - Continued
Engine - Painting (14-08)

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 2 - Pt2 Page Navigation
  287    288    289    290    291  292  293    294    295    296    297  
img
.
TM 5-3810-307-24-2-2
Engine Run-In Procedure "In Chassis"
- (On- and Off-Highway Vehicles)
(14-07)
On-Highway
CAUTION
Refer to General Engine Test Procedures
(Chassis  Dynamometer)  (14-05)  before
operating  the  engine  to  avoid  internal
component damage.
Operate the engine at 1,500 to 1,800 RPM in high gear
for the first 80 to 160 kilometers [50 to 100 miles] after
rebuild.
NOTE
Do not idle the engine for more than five
minutes at any one time during the first 160
kilometers [100 miles] of operation.
Off-Highway
CAUTION
Refer to General Engine Test Procedures -
(Chassis  Dynamometer)  (14-05)  before
operating  the  engine  to  avoid  internal
component damage.
Operate the engine as follows during the first 3 hours
after rebuild:
1. Do not idle the engine for more than 5 minutes at
any one time.
2. Operate the engine at 75 percent throttle while
loaded.
14-21 C-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.