TM 10-1670-298-20&PaEnter the date (day, month, and year) of each inspection and packing action applied to theparachute. These actions include the initial pack (1), after-use repack, 120-day Inspection andrepack, and routine inspection (2), as applicablebNo entry is required for jumped or airdropped equipmentcFor initial packing, enter "in", thereafter, enter a check mark in the column each time the parachuteis replaced.dEnter the packers name performing the initial pack, repack, or routine inspection, as applicable.The packer shall sign this entry.eThe inspector who has performed the pack-n-process inspection or routine inspection shall sign theentryfEnter the publication number and date of the Modification Work Order (MWO) which prescribes thework (1) (Figure 2-9)gEnter a short, abbreviated title extracted from the MWO prescribing the work.hEnter the last name of the individual who has performed the modification. If the original log recordfor the parachute has been lost and it has been ascertained through inspection, that a particularmodification has been accomplished, the entry for this column will be "C/N" (2) (Figure 2-9) whichsignifies the applicable MWO has been complied with.Figure 2-9. Log Record Entries for the Modification Work Order Compliance Page, Typical2-24
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business